For most recent pictures (&/24/06) click HERE
(7/5/06) click HERE

(8/3/06) click HERE

Construction Progress ... 4/19/06


Street Sign on north-west corner

From 4S Ranch Pkwy

Looking into center of campus from 4S Ranch Pkwy

Future Bus Loop

From Monterey Ridge Drive

Looking into campus from Monterey Ridge Drive
 

Construction Progress ... Staff Takes an Inside Tour 5/26/06


"A" building from inside campus

entering the main office

looking into the main office / health office

Mrs. Hart and Mrs. Felker look over their work space.

glass walled conference room in the "A" building

staff lounge

staff work room

The MP Room is part of the "A" Building

library ~ the tables will be in this area and the "stacks" will be under the arches

library ceiling will be exposed beams

Ms. Brose, ESS Supervisor, standing in the doorway of her new office

front of "A" building
from parking lot

future hallway with
"A" building / outside of ESS on left
Building "B" on right

common room - the center of all classroom buildings

interior door - from common room into a classroom

1 of 37 classrooms

front of classroom - sink, cabinets that will be covered with sliding whiteboards, and teacher work area

sink area

teacher's work area

classroom windows - exterior door on far left

exterior door

from common room into "double room"

a "double room" with sliding wall panels that can be configured several ways

"double room" from opposite end

1 of 2 student bathrooms in each village

staff work / conference room in each village

back patio into common room

courtyard between buildings
solar panels in background

center of campus - future amphitheater

entrance into a kindergarten room

kindergarten room with bathrooms

kindergarten play yard

exterior of preschool and part of preschool yard

preschool yard

lunch area

handball courts on playground

solar panels on back hill will provide about 50% or the schools electricity

The sign is now in place.

Construction Progress ... a quick peek on 7/5/06


Entrance to Office

Entrance to MP Room from Blacktop

Hallway Overhang

Entrance to Classroom Building from Hall

Common Area

Double Classroom

Single Classroom from Inner Door

Single Classroom from Other Corner

Outside Entrances to Classrooms

Building A Looking Across Center

Library Entrance
Observer Noticed:
-Almost all of exterior is painted
-All roofs complete
-All exterior doors on
-All interior doors on
-All windows are in
-Most student bathrooms complete
-Most Classroom walls complete
-Most buildings are carpeted
Still Needed:
-Hallways
-Concrete work
-Classroom Ceilings
-MP Room finish work
-Building A finish work
-A LOT of cleanup